The Convention was signed in 1997. A and B sections, approximately 22 km. In 1998, the construction of the long and double rail line started. Kaiser served in Bursa Metropolitan Municipality in the fields of Construction Supervision, Engineering, Project Management and Consultancy. Section A is 17 km and 3.4 km is underground and the rest is level crossing, most of which is in the middle road median. Part B is 4.8 km in total and 1 km of tunnels and 400m viaducts are made level. Operation and Maintenance Center; It meets all the storage, maintenance, cleaning and repair requirements for the vehicle fleet and equipment and materials of the system.
In Project Scope;
In Section A, there are 17 stations, 4 of which are underground, 5 of them are transformer centers, and 6 of which are underground, 1, elevated and 4 levels, and 2 are transformer centers. In addition, there are 100 vehicle capacity vehicle maintenance workshops, Warehouse Area, Operation and Control Center, 2700 square meters administrative and training building, 1670 square meters auxiliary buildings, 10,500 square meters repair and maintenance works are done. Section A covers the Small Industry - Urban and Organized Industry - Acemler lines. Section B covers Şehreküstü - Arabayatağı line.
Within the scope of the project, all works related to the preparation of Public Transportation Survey, Circulation Plans, Travel Requests and Feasibility Reports, Preparation of route and station application projects, preparation of tender documents and support to the Contracting Entity during the tender process were carried out by us.
48 busses Siemens B80 type bellows light rail system vehicles which make up the fleet to work on the line have been fulfilled. A and B lines are integrated with each other.
Some of the completed facilities of the project; Facilities of Mechanical Maintenance and Repair Units (Electricity, Lighting, Energy, Lightning, Telecommunication, Announcement, Radio, SCADA, Transmission, Signalization Control System etc.) Mechanical, Water Supply, Wastewater, Discharge Systems, Vehicle Washing, Crane, Heating, Ventilation , Air Conditioning Facilities
Section A was put into operation in 2002 and Section B was put into operation in 2008. In both departments, we continued our work for the elimination of defects and warranty period for 2 years.